2 Chronicles 3:1-3
Christian Standard Bible
Building the Temple
3 Then Solomon began(A) to build the Lord’s temple in Jerusalem on Mount Moriah(B) where the Lord[a] had appeared to his father David, at the site David had prepared on the threshing floor of Ornan[b] the Jebusite. 2 He began to build on the second day of the second month in the fourth year of his reign. 3 These are Solomon’s foundations[c] for building God’s temple: the length[d] was ninety feet,[e] and the width thirty feet.[f]
Read full chapter
2 Chronicles 3:1-3
New International Version
Solomon Builds the Temple(A)
3 Then Solomon began to build(B) the temple of the Lord(C) in Jerusalem on Mount Moriah, where the Lord had appeared to his father David. It was on the threshing floor of Araunah[a](D) the Jebusite, the place provided by David. 2 He began building on the second day of the second month in the fourth year of his reign.(E)
3 The foundation Solomon laid for building the temple of God was sixty cubits long and twenty cubits wide[b](F) (using the cubit of the old standard).
Footnotes
- 2 Chronicles 3:1 Hebrew Ornan, a variant of Araunah
- 2 Chronicles 3:3 That is, about 90 feet long and 30 feet wide or about 27 meters long and 9 meters wide
The Christian Standard Bible. Copyright © 2017 by Holman Bible Publishers. Used by permission. Christian Standard Bible®, and CSB® are federally registered trademarks of Holman Bible Publishers, all rights reserved.
Holy Bible, New International Version®, NIV® Copyright ©1973, 1978, 1984, 2011 by Biblica, Inc.® Used by permission. All rights reserved worldwide.
NIV Reverse Interlinear Bible: English to Hebrew and English to Greek. Copyright © 2019 by Zondervan.